CLIENT: City of St. John's
YEAR: 2015
ROLE: Roundabout Design
CATEGORY: Roundabouts
CLIENT: City of St. John's
YEAR: 2015
ROLE: Roundabout Design
CATEGORY: Roundabouts
Past planning by the City of St. John’s with respect to the construction of the Team Gushue Highway has identified needed infrastructure investments at nearby intersections in order to help with traffic congestion and to provide a streamlined, efficient traffic network to accommodate this new piece of highway infrastructure in the City.
Not only must these types of intersections (adjacent to the highway) provide for safe, efficient movement of traffic, they must also be designed in a way that is user-friendly for pedestrians, drivers, cyclists, trucks and other road users. Further, this type of “gateway” intersection must work to promote economic development in this area of St. John’s by creating a sense of local identity and bringing more people to the area.
HTC investigated the option of a roundabout design and a signalized intersection for the Blackmarsh, Empire, Redmond intersection. In both cases, was to provide a prominent gateway feature for this area of St. John’s. The final design was selected to be a roundabout in order to give a safe, high-capacity intersection and will serve all users (vehicles, trucks, pedestrians, cyclists) in the best manner possible. The work is described below: